COBIAX | Columbia University Medical Center
2014

Columbia University Medical Center

Designed during Jenga fever outbreak

Project countryUnited States

Project locationNew York City

Architect Gensler / Diller Scofidio + Renfro

Structural engineerLeslie E. Robertson Associates

Executing companySciami CM / Difama Concrete

The Columbia University Medical Center is a state-of-the-art medical and graduate education building that reflects how medicine is taught, learned, and practiced in the 21st century. Designed by Diller Scofidio + Renfro in collaboration with Gensler as the executive architect, this 14-story glass tower interweaves technologically advanced classrooms, collaboration spaces, and a modern simulation center.

Crazy City

Crazy Stack

The building’s structural spine is a site-formed reinforced concrete vertical core, which provides shear capacity. In the cascade, there are reinforced architectural concrete columns with embedded steel-up girders. Post-tensioned, reinforced concrete slabs with embedded structural steel and Cobiax void formers enable the long spans and cantilevers of the south facade.

14th floor

Conference room surrounded by glass

The building was awarded LEED Gold for sustainable construction. Environmental technology such as fixed and operable shading optimizes the regulation of daylight and sunlight and an innovative mechanical system that maximizes comfort, while at the same time reducing the energy and water consumption in the building. Green roof technologies reduce the heat-generating effects of urban asphalt and concrete, decrease building energy consumption, and recycle stormwater runoff. Native plantings adapted to the area’s sun and wind conditions minimize irrigation requirements and produce year-round texture, color, and shelter. LEED, or Leadership in Energy and Environmental Design, certification is a globally recognized symbol of sustainability achievement.


Image 1: © Cobiax USA Inc. | Images 2 and 3: © Pavel Bendov

Product line used

Cobiax SL

The modular product line for international use, thanks to the half-shell technology. This line of products enables effective transport and easy assembly.

Learn more.

More Projects

2023

ProSiebenSat.1 New Campus

Unterföhring

Sustainability at its best: LEED certification in gold

Learn more.
2023

Mainz University of Applied Sciences

Mainz

The departments of engineering and design will move into the 2nd construction phase of the Mainz University of Applied Sciences, which is equipped with Cobiax technology and has a total floor space of around 13,000 m2.

Learn more.
2022

A2 Business park

Rothenburg

A modern commercial building is being built in Rothenburg directly on the highway. The building comprises a total of 10,000 m2 of commercial and office space.

Learn more.

News

All the news from the world of construction