Cobiax EL
(Eco Line)
For wider scopes with thick slabs.
Tried and tested
Cobiax EL
Robust voided modules for large savings in terms of load and materials.
The product line, Cobiax EL, was the first standardized and certified Cobiax product line.
A traditional product line.
Only available in Germany, or upon request. Follow-up product CLS available.
Technical Data.
Reduction of concrete
115 to 191 l/m2
Load reduction
286 to 477 kg/m2
CO2 reduction
0.024 to 0.04 t/m2
Void height
27 to 45 cm
Support height
27,5 to 45,7 cm
Bandwidth of slab thickness
40 to 75 cm
Definition of terms
To describe the Cobiax products unambiguously and clearly, we have agreed on a uniform set of terms. We would like to clarify these terms here in general.
1. System
When people talk about Cobiax in a practical sense, we speak of the Cobiax system or Cobiax technology. The Cobiax system or is used to build special slabs of reinforced concrete.
2. Slab
Slabs in which the Cobiax system is installed are called Cobiax voided flat slabs or simply Cobiax slabs. They consist of a void former zone on the one hand and a solid zone on the other. The installation elements are used in the void former zone.
Cobiax installation plan with blue underlaid void former zone. The solid zone is white.
3. Installation element
Installation elements refers to the objects that are actually to be built into the slab. They consist of different components depending on the product line.
The installation element of the Cobiax EL is called void former module. Its components are:
- 5 up to 8 void formers
- 1 fixing element made of steel (cage-shaped)
This is the installation element of the Cobiax EL with 7 void formers.
4. Component
The components of the installation elements of all product lines are called void formers.
The void former component of Cobiax EL consists of a single sphere.
The Cobiax EL sphere.
Cobiax EL has been used in the following projects:
2022
Museum Reinhard Ernst
Wiesbaden
A museum for abstract art is being built in a central downtown location.
Learn more.2014
Office building on Lilienthal Boulevard
Opfikon
New construction in the Minergie standard (minimal energy consumption)
Learn more.2018
Parking garage Glücksteinquartier
Mannheim
Lots of space for cars - thanks to Cobiax.
Learn more.2012
Technical Center
Dresden
Learning in a sophisticated atmosphere: A special technical centre for research by the Faculty of Electrical Engineering and Information Technology at Dresden Technical University.
Learn more.2018
Work Life Center, Mittelbau
Hamburg
From the outside, 1887. From the inside, the present.
Learn more.2022
Urban garden Hamburg
Hamburg
Sustainable urban development with Cobiax: A former shelter is everything in one: war memorial, place of creativity and event location. And now also an urban garden.
Learn more.2020
Boehringer administration building
Ingelheim on the Rhine
Modern, highly automated office building with 6 floors.
Learn more.2021
WIKA Development Center
Klingenberg
The building, constructed with Cobiax technology, creates great openness and transparency between the respective work areas.
Learn more.