Project countryGermany
Project locationUnterföhring
Builder Deutsche Anlagen-Leasing
Architect Vielmo Architekten GmbH
Structural engineerBollinger und Grohmann GmbH
Executing companyRiedel Bau
Cobiax has got involved: The major project being undertaken by ProSiebenSat.1 Media SE, the “New Campus” complex of buildings has a strong focus on sustainability and will receive LEED certification in gold.
The new building is divided into two phases of construction, the first of these is expected to be finished in the summer of 2021. Phase B will only start once all of the employees have moved into their new offices. According to the current status of the planning, building works will continue until 2023. Situated on the sizeable 26,000 square-metre plot of land between the S-Bahn local railway and Dieselstraße, the new building will provide around 85,000 square metres of space for offices, data centres and studios. The whole of the four-storey building will be equipped with modern facilities. There are plans for flexible and adaptable meeting rooms, attractive areas for events and also modern lounges and recreational areas.
A bridge will run along the northern section, which will have branches to the southern section that link every part of the building by the most direct route. There are also plans for a large, internal “piazza” with a cafeteria and a landscaped platform, which is designed to function as a central meeting point for the employees.
At this point, it’s worth mentioning one special feature in terms of the technology being used in the construction: parts of the building will function as a “Faraday cage”, which is being created by welding steel mats in the ceilings of the building. This type of construction protects the building from all kinds of signals and so guarantees an extremely reduced level of interference when running broadcasts.
In just the first section of the building, an area of 12,500 square meters of Cobiax-SL void formers will be used. This makes 900 m3 of concrete obsolete, which will reduce the amount of CO2 that is released into the environment by 189 tonnes. In addition, considerably fewer concrete mixers will need to make the trip to the building site. A reduction in construction traffic always makes sense for the company carrying out the work and not least for the city itself. The icing on the cake: lorries don’t need any fuel either, if they’re not moving.
Information and facts:
Sustainability: | LEED v4 certification in gold |
Void former area (first section of the building): | 12,500 m2 |
Footprint: | 26,444 m2 |
Usable area: | 84,375 m2 |
Workspaces: | 1,700 |
Highlights: | open-plan, public entrance area with the Open Academy, the inner courtyard with a landscaped platform, employee catering for up to 1,400 meals, cafeteria on the first floor with a large outdoor terrace, 4 studios with the latest production and broadcasting technology, modern conference rooms with a generous foyer and project rooms, 7 connecting bridges between the different parts of the building, 14 garden and rooftop terraces |
Images 1 and 2: © ProSiebenSat.1 | Image 3: © ARGE Kohlbecker Vielmo / ProSiebenSat.1
The modular product line for international use, thanks to the half-shell technology. This line of products enables effective transport and easy assembly.
Learn more.In a new research building costing 73 million Euros and with 5000 m2 of floor space, researchers from medicine and the natural sciences will be able to pool their expertise from 2024 onwards.
Learn more.A modern elementary school for students from six grades is being built with sustainable Cobiax void former technology.
Learn more.Eight-storey residential building with a wide range of retail on ground floor.
Learn more.A service and logistics building is being constructed on the former industrial site as a modern superstructure with a wide range of possible uses.
Learn more.In the heart of the campus, open on all sides and built sustainably with Cobiax.
Learn more.A Bundestag administration building is being built in Berlin. A lot of glass requires little weight. Cobiax was the logical choice.
Learn more.State-of-the-art sustainability criteria through Minergie-Eco certification.
Learn more.The multifunctional center is a large complex project and includes, in addition to the hospital building, an exhibition hall, a library and a café.
Learn more.Another perfect match of architecture and Cobiax: the characteristic wide cantilevered balconies could only be efficiently implemented thanks to the weight reduction provided by the Cobiax void formers.
Learn more.Conference services remarkably improved – in a metal dress
Learn more.Directly on the Main River, next to the new headquarters of the European Central Bank, the “Hafenpark Quartier” is being developed in Frankfurt’s Eastend district. Cobiax is being used to build the towers, which will contain several hundred apartments.
Learn more.Building more sustainably at the new headquarters.
Learn more.